EN10219 S275JR ERW Welded Steel Pipe
Structural EN10219 S275JR ERW Welded Steel Pipe hollow sections shall be manufactured by ERW (electric welding) or SAW (submerged arc welding) without subsequent heat treatment (see 6.5). Hollow sections S275JR ERW Welded Steel Pipe manufactured by a continuous process shall not include the welds used to join the lengths of strip prior to forming the hollow section, except that for helically welded submerged arc-welded (SAW) hollow sections, such welds shall be permitted when tested in accordance with 9.4.3.
- Electric welded hollow sections S275JR ERW Welded Steel Pipe are normally supplied without trimming the internal weld bead.
- All NDT activities shall be carried out by qualified and competent level 1, 2 and/or 3 personnel authorised to operate by the employer.
- The qualification shall be in accordance with EN 10256 or, at least, an equivalent to it. It is recommended that the level 3 personnel be certified in accordance with EN 473 or, at least, an equivalent to it. The operating authorisation issued by the employer shall be in accordance with a written procedure.
- NDT operations shall be authorised by a level 3 NDT individual approved by the employer.
- NOTE The definition of levels 1, 2 and 3 can be found in the appropriate standards, e.g. EN 473 and EN 10256.
ABTER as one of the largest steel pipe mill in China, is professional in EN10219 S275JR ERW Welded Steel Pipe manufacturing and exporting. Except the EN10219 S275JR ERW Welded Steel Pipe hollow sections, we also produce API 5L line pipe and ASTM A53 fluid steel pipe and ASTM A252 piling pipe, too. Welcome you to send us your inquiries.
EN10219 S275JR ERW Welded Steel Pipe Specification
Product Name | S275JR ERW Welded Steel Pipe |
Diameter | 1inch – 26inch |
Wall Thickness | SCH 20,SCH 30,STD,SCH 40 |
Length | Random length from 3m to 20m |
Pipe Standard | EN10219, EN10210, ASTM A53, A106, API 5L |
Steel Grade | S275J0H, S275JRH, S275J2H, S355J0H, S355JRH, S355J2H etc. |
Application | Structure steel tube, construction pipe, foudation pipe, piling tube, |
Pipe Coating | Black painting, varnish paint, anti rust oil, or |
Package | Plastic caps on both ends, Steel bundle, or acc. to customers’ request |
Inspection | ISO9001, SGS,BV, GL or other TPI appointed by customer |
Capacity | 10000 metric tons per month |
Delivery time | 30 days against deposit or LC at sight |